In multi-story buildings, the plumbing requirements stipulate that a vertical and horizontal drainage system must be designed to ensure proper wastewater management and venting. This design is essential because multi-story structures involve complex drainage needs to manage the flow of wastewater from multiple levels.

A vertical drainage system is crucial as it collects and transports waste from individual floors to the building’s main sewer line. This vertical component must be adequately sized to handle the volume of wastewater generated from all the fixtures throughout the building. The horizontal drainage system then connects various fixtures on each floor to the vertical stacks and must also be designed to facilitate proper flow and prevent blockages.

Additionally, these systems must be installed with the correct pitches to ensure that water flows effectively by gravity, which is vital for maintaining the overall functionality of the plumbing system within a tall structure. Proper venting must be included to prevent pressure buildup that could lead to drainage issues.

While there could be scenarios with simpler systems in smaller or single-story buildings, they do not provide the necessary efficiency and reliability required in multi-story applications where drainage and venting become more complicated due to the height and increased usage. Therefore, a comprehensive design incorporating both vertical and horizontal elements is a requirement for effective plumbing in multi-story buildings.